RUBBERMAID

TENANT:

DEVELOPMENT, DESIGN & CONSTRUCTION SERVICES

INDUSTRY:

AREA:

816,000

SIX MONTH COMPLETION

PROJECT HIGHLIGHTS:

EXXCEL was hired to provide development, design, and construction services for the construction of a new distribution facility for Pepsi CO to serve the Indianapolis Gatorade plant. Phased construction helped accelerate the schedule of completion for this project. Beginning with a mass grading permit, dirt work was performed before installation of foundations. Concrete floor slabs were installed before and after roof construction, and concrete paving was utilized in lieu of asphalt in various areas of the exterior. EXXCEL’s accelerated timeline of this project was six months from preliminary earthwork to tenant occupancy.

The 1.12 million sf building consists of main and supplemental office spaces, restrooms, break areas, conditioned storage areas, and automated repackaging areas. There are 127 dock doors, 547 trailer parking spaces, 32’ clear height, 8.5’ precast concrete exterior walls, ESFR fire protection, and all construction was food grade.